Click for Home


 
Site Map        
Rafferty Fee Lease No. 1
Affordable Feed & Tack
13-Acre Oilfield Property
Fondren Southwest Shopping Center
Federal Reserve Bank
Former Iron Works Facility
Former National Lead Lease Facility
Hardy Street Railroad Yard
Former Benjamin Moore & Company Property
KBR Greens Bayou Fabrication Yard
New Jersey Groundwater Remediation
Eureka Railroad Yard
Mar Bella Property Drill Sites
Sharp Corp. Drill Site
Marine Coatings Facility
Former Pesticide Manufacturer
Commerce Street Railroad Yard
Brownsville Railroad Yard


Mar Bella Property Drill Sites

SKA was retained by Taylor-Morrison to perform an environmental due diligence study and site investigations for the potential acquisition of an approximately 457-acre undeveloped property located in League City, Galveston County, Texas.  The Phase I Environmental Site Assessment (ESA) identified two historical oilfield drill sites on the property that had been predominantly undeveloped since 1932.  Upon acquisition of the property by the Client, the two drill sites were entered into the Railroad Commission of Texas (RRC) Voluntary Cleanup Program (VCP) with the ultimate goal of obtaining a final Certificate of Completion for residential land use with no restrictions. 

Site investigations were supported with extensive subsurface soil investigations, geophysical studies, and a focused groundwater sampling plan which identified adverse contaminants in shallow soils consistent with former petroleum exploration and production activities.  Specifically, arsenic and barium were identified above their respective critical Texas Commission on Environmental (TCEQ) Texas Risk Reduction Program (TRRP) Tier I Residential Protective Concentration Levels (PCLs) in shallow soils within a former oilfield reserve pit overgrown with vegetation.

The soil response actions included source removal of 220 cubic yards of inorganic-impacted soils and off-site disposal.  Confirmation soil samples collected by SKA from the excavation areas confirmed all native soils were protective of their applicable PCLs.  All corrective actions were managed by SKA and were documented in a Response Action Completion Report (RACR) to the RRC-VCP.  Upon approval of the RACR, the RRC-VCP will issue a final Certificate of Completion for residential land use with no restrictions (anticipated regulatory closure is Summer 2009).

Related Services
- Property Assessments
- Voluntary Cleanup Program/Risk-Based Corrective Action Program
- Oil and Gas Site Assessment and Cleanup

Send mail to info@skaconsulting.com to request a Statement of Qualifications for our firm.

Related & Resources
Air & Radiation issues
Water
Pollution Prevention Homepage
Wetlands, Oceans, and Watersheds
Science & Technology
Solid Waste and Emergency Response
Enforcement & Compliance
Prevention, Pesticides and Toxic Substances


Newsletter
Subscribe
Text-only

view sample
 Copyright © 2010 SKAConsulting.com

Site Map